June 2025 - 1. Loop work & 2. Water Testing

LOOP


The loop has been completed with cost totalling $3,194.27 including, materials, equipment & labour.  The original cost that we were quoted was $6,000 for materials alone.  Proof that the ASADA continues to work hard on your behalf and is being fiscally responsible.

A special thank you to Chris Christensen for his hard work ensuring that we had the right equipment, person-power and materials while coordinating and trying to make the work as painless as possible for the community!  The ASADA has exceeded expectations



ASADA Lomas del Mar 

The Lomas del Mar ASADA has a control program for the quality of drinking water, carrying out semi-annual analyses in accordance with Decree 38924-S from the Ministerio de Salud.

In the tests conducted in June 2025, its entire distribution system complies with the (Microbiological) parameters of said regulation.